Saturday, 25 February 2012

Today, I completed the first of the two tinkerbells. Here she is in the February sunshine:

Wednesday, 1 February 2012

More progress

Well, the weather's taken a turn for the worse but progress hasn't. The boilers are both now lagged, and one tink has the cladding on. She also has the manifold fitted, the boiler clacks, and one injector is piped up. The ejector is all done, as is the blower. So, before the first set of tanks return, I need to do the small injector piping then I'm ready for them to go on. Next, the second set of tanks will go to be sprayed, and I get to start doing the lining.

Saturday, 14 January 2012

Progress to date

Since the last post, lots of little jobs have been done, moving the locos closer to completion. These include finishing off painting the frames, building the manifolds, fitting the vacuum controls and piping, making the blast pipes, and getting the buffer beams and smokebox supports painted. A big job has been to fit the chimnies. Over xmas I painted and lined the cylinder covers. Last week the boiler cladding went to the sprayer for painting. He says that it will be done by next week, when I will take the tanks, bunkers and cabs up to him for some of his magic. After that I have to do the lining. . . . So today I did 2 of the last 3 jobs needed before the cladding can go on - making and fitting the steam pipe from the regulator valve to the pipe between the frames, and painting the smokeboxes. All that remains is to fit the lagging. Once the cladding is on, I will fit the manifolds, then pipe up the blower and injectors. Then I'm ready for fitting the tanks.

Friday, 30 September 2011

In the sunshine

I took the opportunity of getting the locos out today in the sun to get some jobs done that are difficult in the shed. Having completed the second set of tanks and bunker, they got attached to the running boards. I also fixed the cab front to the second loco. Below is a photo of the two locos together - at last, they really do start to look like real locomotives!!!

Friday, 23 September 2011

Tanks. . . . .

Today, I completed the tanks for tinkerbell number 2. All they need is the running boards drilling so that they can be bolted down, and they're ready to go. Over the next days, I will be drilling those holes and fitting the weatherboard. Then, its on to the bunker and roof.

Tuesday, 30 August 2011

Progress


The picture above shows progress to date on twin 1. The tanks are done, the bunker/cab are very nearly done (just need the coal rails adding), and it's really starting to look like a locomotive at last. Attention will now turn to building the tanks, bunker and cab roof for twin 2, before the whole lot goes to the sprayer.

Thursday, 5 May 2011

A better photograph

Now that the dust has settled on the boilers, it's time to take a better photograph.