Wednesday, 1 February 2012

More progress

Well, the weather's taken a turn for the worse but progress hasn't. The boilers are both now lagged, and one tink has the cladding on. She also has the manifold fitted, the boiler clacks, and one injector is piped up. The ejector is all done, as is the blower. So, before the first set of tanks return, I need to do the small injector piping then I'm ready for them to go on. Next, the second set of tanks will go to be sprayed, and I get to start doing the lining.