Friday, 30 September 2011
In the sunshine
I took the opportunity of getting the locos out today in the sun to get some jobs done that are difficult in the shed.
Having completed the second set of tanks and bunker, they got attached to the running boards. I also fixed the cab front to the second loco. Below is a photo of the two locos together - at last, they really do start to look like real locomotives!!!
Friday, 23 September 2011
Tanks. . . . .
Today, I completed the tanks for tinkerbell number 2. All they need is the running boards drilling so that they can be bolted down, and they're ready to go. Over the next days, I will be drilling those holes and fitting the weatherboard. Then, its on to the bunker and roof.
Tuesday, 30 August 2011
Progress
The picture above shows progress to date on twin 1. The tanks are done, the bunker/cab are very nearly done (just need the coal rails adding), and it's really starting to look like a locomotive at last. Attention will now turn to building the tanks, bunker and cab roof for twin 2, before the whole lot goes to the sprayer.
Thursday, 5 May 2011
Friday, 15 April 2011
Boilers on!!
By the time the job was done, the light was fading so the photo's not great quality, but I had to take one to record the event.
Wednesday, 13 April 2011
Ready for the boilers
In the past couple of weeks, I have:
1) Completed the 'underneath' work on both locos (ashpans, firebar supports)
2) Fitted the smokeboxes
3) Made and fitted the running boards
So both chassis are now ready to receive their boilers. Hopefully I can get this done at the weekend.
1) Completed the 'underneath' work on both locos (ashpans, firebar supports)
2) Fitted the smokeboxes
3) Made and fitted the running boards
So both chassis are now ready to receive their boilers. Hopefully I can get this done at the weekend.
Wednesday, 6 April 2011
Progress . . . .
The two smokeboxes are now complete with doors, hinges and associated closing gear. Recently, I have been fitting the ashpan to loco number 2, and this has also had the firebar supports fitted. The next jobs are to complete number 2's ashpan, then get the smokebox saddles bolted to the frames ready to put the smokeboxes on.
Monday, 21 March 2011
Smokeboxes
Well, after a few months out to build a pair of diesels, it's now tinkerbell time again. I have recently welded up the smokeboxes, and am currently busily making the associated furniture - hinges, dart etc.
The drain cock assemblies have gone in, as has the vacuum brake swan necks.
I am currently working on getting everything 'underneath' done ready to put the boilers on.
Photos and further updates to follow soon.
The drain cock assemblies have gone in, as has the vacuum brake swan necks.
I am currently working on getting everything 'underneath' done ready to put the boilers on.
Photos and further updates to follow soon.
Subscribe to: