It's been a long while since I found time to write something here. Sorry!!
Since the last update, I have:
1) Completed the chassis and air tested them
2) Made and fitted the ashpans
3) Made the drain cocks
4) Fetched the boilers
5) Made the smokeboxes
Currently, I'm also building a pair of diesels for friends, but hope to get these completed soon so that I have more room to work on the tinks. Then, I'll be fitting and piping up the drain cocks and blast pipes, then it's full steam ahead with fitting the boilers.
Wednesday, 6 October 2010
Subscribe to:
Posts (Atom)