Sunday, 25 May 2008
Summary of progress to date
Wheels obtained
Driving wheel bearings obtained
Rear trucks built
Handbrake stand, column and lever made
Laser/water cuttings obtained
Swings links bored out and bearings fitted
Combination levers tapped and bored, bearings fitted
Banana links finished and painted
Axles turned to length
Weigh- and brake shaft turned to length
Conn and coupling rod bearings obtained
Driving wheel bearings obtained
Rear trucks built
Handbrake stand, column and lever made
Laser/water cuttings obtained
Swings links bored out and bearings fitted
Combination levers tapped and bored, bearings fitted
Banana links finished and painted
Axles turned to length
Weigh- and brake shaft turned to length
Conn and coupling rod bearings obtained
Moved build log to a blog
In order to simplify things (and thus, hopefully keep regular progress updates coming out), I have decided to move the build log to a blogging site.
Subscribe to:
Posts (Atom)